Property Details:

  • 87 units | Midrise | 9 stories
  • Underground garage under building
  • 14 total parking spaces Deeded parking
  • Located in Portland’s Lloyd District
  • Building was completed in 2010
  • Home Owners Association (HOA)

Technology Solution: RVE Electric Vehicle EnergyManagement Systems (EVEMS) connected into the wiring that runs between a condo unit’s electric meter and the in-unit electrical panel, allowing all charging to be billed on the unit owner’s utility bill.

 

View the Case Study here

Property Details

  • 112 units | 2 buildings | Midrise | 4 stories each
  • Underground garage beneath each building: 128 total EV parking spaces
  • Condominium developed by Stanford University specifically for faculty
  • Faculty purchase and own units while residing at property
  • Property management group operates day-to-day
  • 1 Homeowners Association serves the community, both buildings and garages

Technology Solution: GoPowerEV SmartOutlets & PowerShift Platform

Archived Case Study Library | Pre-2024

This case study provides the planning and design, and post-construction operations and analysis of the EV chargers for a 15 story luxury mixed-use condominium building of 123 residential units with ground floor retail in Portland, Oregon built in 2005.
View the case study here

This case study provides the planning and design, technology solution by OpConnect and post-construction operations and analysis for a high-rise condominium building with 376 residential units in Honolulu, Hawaii.
View the case study here

 

This case study provides a unique off-site solution for EV drivers living in nearby Multifamily housing(MFH) properties, where The Takoma Park Community Center building in Maryland has installed three 7.2 kW AC Level 2 charging stations and one 36 kW Direct Current Fast Charger (DCFC), owned and operated by the Electric Vehicle Institute (EVI).
View the case study here

This case study provides a unique off-site solution for residents living in Multifamily housing(MFH), where a former gas station, RS Automotive in Takoma Park, Maryland, transformed into an EV charging hub with four 50 kW DC Fast Charging stations and two 7.6 kW Level 2 charging stations.
View the case study here

This case study provides the planning and design, technology solution by EV Match and post-construction operations and analysis for a mixed use property of 168 apartments with ground floor retail in Campbell, California built in 2015.
View the case study here

This case study provides the planning and design, technology solution by Liberty Plugins and post-construction operations and analysis for a residential property of 219 apartment units in Atlanta, Georgia.
View the case study here

 

This case study provides the planning and design, technology solution by PowerFlex and post-construction operations and usage analysis for a large mixed-use residential complex with 329 residential units in San Francisco, California.
View the case study here

 

Veloz resource website housing MFH EV charging case studies