Multifamily Case Studies

Case Study Library | 2025 onward

View the case study here

Property Details:

  • Location: Bethesda, Maryland

View the case study here

Property Details

  • Location: San Mateo, CA
  • Property Size: 111 units & Parking Spaces, Secured Parking
  • Incentive Funding Secured: $64,000 from Peninsula Clean Energy
  • ROI Timeline: Under 3 years
  • Expected Annual Profit (2024): $4,922

Technology Solution: 30 level 1 Orange smart outlets

 

View the case study here

Property Details

  • Location: Santa Monica, CA
  • Property Size: 32 apartment units with over 40 residential parking spaces
  • Notable Features: Subterranean garage installation, OrangeNet Bluetooth mesh connectivity, part of a larger garage renovation initiativeHow

Technology Solution: 32 Orange EV chargers (one per residential unit)

View the case study here

Property Details

  • 36 units | 70 parking spots | 4 stories
    • 36 deeded tenant spots
    • 34 staff, visitors and resident spots
  • 8 parking spaces converted to EV charging spaces
  • Underground garage

Technology Solution: Networked ChargePoint Level 2 (L2) Chargers

  • 8 L2 networked charging ports to match existing charging set up
  • Networked L2’s allowed HOA to accept payment from drivers – HOA opted out of covering electricity used byEV drivers
  • HOA set charging rate to cover electricity and networking costs, and included an amortized schedule to recoup out of pocket installation costs

View the case study here

Property Details:

  • Location: Brooklyn, New York
  • Property size: 171 units
  • New development

Technology Solution:

  • SWTCH’s “charging-as-a-service” (CaaS) offering

View the case study here

Property Details

  • 87 units | Midrise | 9 stories
  • Underground garage under building
  • 14 total parking spaces Deeded parking
  • Located in Portland’s Lloyd District
  • Building was completed in 2010
  • Home Owners Association (HOA)

Technology Solution: RVE Electric Vehicle EnergyManagement Systems (EVEMS) connected into the wiring that runs between a condo unit’s electric meter and the in-unit electrical panel, allowing all charging to be billed on the unit owner’s utility bill.

 

View the Case Study here

Property Details

  • 112 units | 2 buildings | Midrise | 4 stories each
  • Underground garage beneath each building: 128 total EV parking spaces
  • Condominium developed by Stanford University specifically for faculty
  • Faculty purchase and own units while residing at property
  • Property management group operates day-to-day
  • 1 Homeowners Association serves the community, both buildings and garages

Technology Solution: GoPowerEV SmartOutlets & PowerShift Platform

View the case study here

Property Details

  • 3 buildings | 90 units | 102 parking spots | 3 stories
  • 92 deeded parking spots
  • 10 staff and visitor spots
  • Underground garage
  • 1 Homeowners Association (HOA) for the property
  • 92 chargers installed total, including 2 ADA spaces

Technology Solution: Pando’s Smart Level 2 Outlets

Archived Case Study Library | Pre-2024

This case study provides the planning and design, and post-construction operations and analysis of the EV chargers for a 15 story luxury mixed-use condominium building of 123 residential units with ground floor retail in Portland, Oregon built in 2005.
View the case study here

This case study provides the planning and design, technology solution by OpConnect and post-construction operations and analysis for a high-rise condominium building with 376 residential units in Honolulu, Hawaii.
View the case study here

 

This case study provides a unique off-site solution for EV drivers living in nearby Multifamily housing(MFH) properties, where The Takoma Park Community Center building in Maryland has installed three 7.2 kW AC Level 2 charging stations and one 36 kW Direct Current Fast Charger (DCFC), owned and operated by the Electric Vehicle Institute (EVI).
View the case study here

This case study provides a unique off-site solution for residents living in Multifamily housing(MFH), where a former gas station, RS Automotive in Takoma Park, Maryland, transformed into an EV charging hub with four 50 kW DC Fast Charging stations and two 7.6 kW Level 2 charging stations.
View the case study here

This case study provides the planning and design, technology solution by EV Match and post-construction operations and analysis for a mixed use property of 168 apartments with ground floor retail in Campbell, California built in 2015.
View the case study here

This case study provides the planning and design, technology solution by Liberty Plugins and post-construction operations and analysis for a residential property of 219 apartment units in Atlanta, Georgia.
View the case study here

 

This case study provides the planning and design, technology solution by PowerFlex and post-construction operations and usage analysis for a large mixed-use residential complex with 329 residential units in San Francisco, California.
View the case study here

 

Veloz resource website housing MFH EV charging case studies
Scroll down to “Charging at Multi-unit Dwellings”.